
Hydraulic jack-in piling · Since 1997
Foundations pressed in, not hammered.
Hydraulic jack-in piling up to 800 tonnes. Every pile is load-tested to twice the load it will carry.
About G-Pile
Piling that is proven, pile by pile.
G-Pile Sistem Sdn Bhd was incorporated in January 1997 and was the first in Malaysia to introduce the 800-tonne hydraulic injection piling system, free of noise, vibration and pollution. More than 100 piling projects in Malaysia and Australia.
Every pile installed is jacked to twice its working load, so the performance of every pile is verified, which matters most on varying ground such as ex-mining land over limestone. Member of CSC Holdings Limited (SGX-listed) since March 2007.
- maximum jacking force
- 800 t
- load test on every pile
- 2×
- projects in Malaysia and Australia
- 100+
- machines, 300 to 800 t
- 16
- IJM Construction Sdn Bhd
- Sunrise Berhad
- Shimizu Corporation
- T.Y. Lin (SEA) Sdn Bhd
- Gue & Partners Sdn Bhd
- Keong Hong Construction
- Jack-in pilingRC square 250 to 550 mm, spun 250 to 700 mm
- Load-tested pilesEvery pile tested to twice its working load
- Difficult groundLimestone and ex-mining land
- Machine fleet300 t to 800 t jack-in machines
Certificates and endorsements
Certifications and memberships
Letters of recommendation
Scans from G-Pile’s earlier website, shown with the dates printed on each document. Current certificates to be supplied by G-Pile.
Why jack-in
Pressed in, not hammered.
Piles are gripped and pressed into the ground by continuous hydraulic force, up to 800 tonnes. Jack-in force is recorded for every 0.3 m of penetration; a set is taken when the force picks up.
| Hammer-driven | G-Pile jack-in | |
|---|---|---|
| Noise | High | Low |
| Vibration | High | Low |
| Pollution | High | Low |
| Installation | Impact driving | Continuous hydraulic pressure |
| Load verification | 1% maintained load test, 10% PDA | Every pile to 2× working load |
| Limestone toe slippage | 30% to 40% | Under 5% (guaranteed) |
Comparison as published by G-Pile. Full comparison with bored piles
About
Technology for the Environment.
G-Pile Sistem Sdn Bhd specialises in the hydraulic injection piling system. First in Malaysia to introduce the 800T hydraulic injection piling system (launched 29 March 1997).
- Incorporated
- 22 January 1997
- Projects
- More than 100 piling projects in Malaysia and Australia
- Fleet
- 16 piling machines, 300T to 800T
- Group
- Member of CSC Holdings Limited (SGX-listed) since March 2007
- Certificates held
- SIRIM QAS (ISO 9001), CIDB (grade G7), MBAM member. Dates shown below.
- Machines
- Sole agent for the machines in South East Asia on behalf of the manufacturer
- Launch
- Launched on 29 March 1997 by the Minister of Housing and Local Government, YB Dato' Dr Ting Chew Peh, at the Nation Holding project site, Selayang, Kuala Lumpur
- Worked with
- IJM Construction Sdn Bhd, Sunrise Berhad, Shimizu Corporation, T.Y. Lin (SEA) Sdn Bhd, Gue & Partners Sdn Bhd, Keong Hong Construction
In the press
- “G-Pile targets Thailand and Indonesia for piling system”Starbiz, The Star · 3 November 2005
- “Jack-in piling at the Rivergate Promenade”Southeast Asia Construction · Nov to Dec 2005
- “Construction without the noise”The Edge · 12 August 2002
- “New hydraulic jacking system”Press article · Early 1998
- “G-Pile confident of Malaysian acceptance”The Sun · 21 April 1997
Technical paper
The use of high capacity hydraulic injection piles for buildings in limestone ex-tin mining sites in Kuala Lumpur
Fourteenth Southeast Asian Geotechnical Conference, Hong Kong
- Jack-in piling with a capacity of 6,000 kN installs piles of design load up to 2,500 kN when ground conditions permit.
- Because every pile is jacked to two design loads or more, its capacity is verified much like a static load test.
Contact
