The jack-in pile method
A pile is gripped by the hydraulic jacking system and pressed into the ground by continuous force. The jack-in force is recorded as it goes, so each pile proves itself as it is installed.
Procedure
- 01
Position
The machine walks on its sleepers to the pile point.
- 02
Place and grip
A precast pile is placed and sequenced for piling, then gripped.
- 03
Jack in
The starter pile is jacked in hydraulically. There is no hammering.
- 04
Weld
The second pile is shafted through and welded to the first, at ground level under the main body.
- 05
Press and record
Jack-in force is recorded for every 0.3 m (1 ft) of penetration.
- 06
Set
A set is taken when the jack-in force picks up, showing the pile has reached a bearing stratum.
- 07
Verify
Normally the pile is jacked to sustain 2 times its working load, like a static load test carried out in an accelerated manner.
Parts of the machine
- Main support frame
- The frame the jacking cylinders react against.
- Patented grip jacking system
- Grips the pile and presses it into the ground.
- Operating control panel
- Where the operator controls jacking, gripping and walking.
- Support sleepers
- Long and short sleepers carry the machine and let it walk between pile points.
- Lateral movement mechanism
- Moves the machine in the X and Y directions and turns it.
Verification
Jack-in force is recorded for every 0.3 m of penetration, and a set is taken when the force picks up, showing the pile has reached a bearing stratum. Normally the pile is jacked to sustain 2 times its working load, which works like a static load test carried out in an accelerated manner. Because every pile is installed the same way, the capacity of every pile is verified.
In erratic limestone, the high jack-in force also ensures good contact between the pile tip and the bedrock.