Jack-in piles in limestone ex-mining land

The use of high capacity hydraulic injection piles for buildings in limestone ex-tin mining sites in Kuala Lumpur. Presented at the Fourteenth Southeast Asian Geotechnical Conference, Hong Kong.

The ground

Tin mining in the limestone formation of Kuala Lumpur left numerous ponds and remnants, mainly sand and clay slime, forming a highly heterogeneous overburden on the limestone. Many ex-mining areas have since become dumping grounds, which complicates the overburden further.

As land becomes scarce, these abandoned areas are valuable for development. Conventional pile driving and bored piling meet uncertainty there: the overburden is erratic, with very soft clay, very loose sand, concrete blocks, wood, steel bars and metal scraps, dump thickness of up to 14 m in one borehole, and cavities up to 3 m high in the limestone.

Where bored and driven piles struggle

Bored piles are usually preferred over driven piles in limestone areas: they can pass through cavity roofs and socket into bedrock, and they avoid premature termination of driven piles on hard lenses, floaters or overhangs. But boring is frequently hindered by debris, and bored holes are unstable in slime or very soft, very loose material, so collapses are still possible even with casing.

Driven piles tend to deviate on an erratic rock surface, and driving is not allowed in many populated parts of Kuala Lumpur because of noise. Bored piling is costly and slow by comparison, and needs stringent construction control.

Jack-in piling as the alternative

Jack-in piling is noise- and vibration-free, with no mud slurry and no excavated material to dispose of. Piles are precast, so their quality is sound compared with bored piles, and there is no hard driving and no uncertainty of in-situ concrete casting. It is much faster than bored piling.

The capacity of each pile is verified by a jack-in force of up to two times the design load or higher. Obstructions in the dump are not a concern: under 2 times design load or more, obstacles are pushed aside or dragged down to the bearing stratum or bedrock.

The paper describes high-capacity systems handling square concrete piles of 250 to 550 mm, spun piles of 0.3 to 0.6 m diameter and steel H-piles, with working capacity similar to normal driven piles, 1000 kN to 2500 kN if ground conditions permit.

Design considerations

Pile capacity. The jack-in force for every 0.3 m of penetration is recorded, and a set is taken when the force picks up, showing the pile has reached a bearing stratum. This is like a static load test carried out in an accelerated manner, and every pile is installed the same way, so every pile is verified. In erratic limestone, the high force also ensures good contact between pile tip and bedrock.

Premature termination. Floating hard lenses can be overcome with a higher jack-in force; boreholes help locate them and pilot piles can test whether penetration is a problem. For a thicker lens, up to 2.5 times design load or more can be tried, and pre-boring is the unlikely last resort.

Cavities. Because every pile is jacked to sustain up to 2 times design load, it should punch through any weak cavity roof, and high jack-in forces verify contact between pile toes and limestone, so local crushing is not a concern. The paper also sets out how bending of a cavity roof can be assessed, and recommends a pile spacing of 3 pile diameters for groups of up to 4 piles.

Summary of the paper as published on G-Pile’s earlier website. Read the original for the full figures.